fast and free delivery on all standard orders

PIZZA OVEN HIGH TEMPERATURE 2 LEAD THERMOPILE / THERMOCOUPLE LONG LEAD WIRE CS0136

Product SKU: 79571_CIBB19

Fixed Price Listing – 1 x Twin Lead 72″ Long Thermopile with Armored Cover for High-Temperature Ovens

This listing is for one (1) twin lead 72″ long thermopile, fitted with an armored cover for protection in high-temperature ovens. This thermopile is commonly found in pizza oven models.

Part Info

  • 72″ LONG

£49.99 £41.66 ex vat

22 in stock

Part Info

  • 72″ LONG

Linked Models

  • Universal

Linked Part Number

Related Products.

Translate »